10/3/2006

Prev | Next | Index | Home

Have have definitely diverged from working on the fuselage once again. I think I am going to continue with the wiring and do as much as I can. Then I will rivet the rear top skin. By then the fuel pump should be here (I ordered it today) and I will finish up the fuel system aft of the firewall. Then I will rivet the front top skin and proceed with the baggage door. Sounds like a plan.

I drilled the rest of the wiring harness holes in the front and center fuselage. I put them in the recommended locations as per the drawings but made those in the center fuselage a lot smaller due to not needing to run battery cables through them.

I installed the bus bar and pulled through most of the wiring harness.

email: Luis Luciani  Prev | Next | Index | Home