|
6/16/2006 |
|
The top left picture is of the baggage compartment all screwed together. The floor gets riveted later after installing the flap fairings. I made two hold down clips for the baggage compartment rear bulkhead as per the plans. Then I scuffed them with a Scotchbrite pad, cleaned them with Acetone and primed them with my rattle can primer. I that started on the WD-813 landing gear weldments. With the work I had done replacing the two F-802H, the WD-813 now fit perfectly. I drilled the holes that attach the WD-813 to the landing gear boxes. I used bolts and high pull strength clecos to make sure they were as tight as possible while drilling. I finished the left one tonight. |
| email: Luis Luciani | Prev | Next | Index | Home |