7/27/2006

Prev | Next | Index | Home

Tonight Christine and I riveted the front part of the cooling ramp. Before the riveting a globbed on some ProSeal where the curved part meets up with the firewall.

I then re-installed the temporary spars and flipped the fuselage right side up. The wooded temporary spars had grown probably due to the high humidity here and were a lot hard this time to get in.

email: Luis Luciani  Prev | Next | Index | Home