Left Tank
 
10/30/2005 Marked centerlines on z-brackets. Clecod fuel tank. 0.4   10/31/2005 Drilled and mounted z brackets 2.0
11/1/2005 Nutplates on z brackets. Mounted tank. 2.0   11/2/2005 Drilled front side of z brackets. Drilled tank. 3.0
11/3/2005 Attached cpacitive sender plates. 2.0   11/5/2005 Access plate, nose attach point and backing plates 3.0
11/6/2005 Drilled, deburred and dimpled 4.5   11/7/2005 Dimpled skin. Attached AN fitting in access plate. 2.0
11/8/2005 ProSealed stiffeners, filler neck and drain 2.0   11/9/2005 Drilled holes in inboard rib. Crimped and soldered sender wires. 1.5
11/12/2005 Installed interior ribs 2.5   11/13/2005 Finished the tank 6.5
11/14/2005 Patched tooling hole 1.0   11/22/2005 Pressure tested the tank 1.5
             