10/25/2005
Next | Prev | Index | Home

I primed the ribs. I let them dry over the afternoon and then clecod them to the front and rear spars. Then I riveted on the first four ribs.

I am not sure but I don't think the rivets called out by the plans for rear spar are right. The plans call for -8 in length but I can't get enough of a manufactured head on them. I think I am going to have to drill these out.

email: Luis Luciani  Next | Prev | Index | Home