|
I primed the ribs. I let them dry over the afternoon and then clecod
them to the front and rear spars. Then I riveted on the first four ribs.
I am not sure but I don't think the rivets called out by the plans for
rear spar are right. The plans call for -8 in length but I can't get
enough of a manufactured head on them. I think I am going to have to
drill these out. |