| Right Wing | |
|
|
|
| Wing kit arrived today! | 6.5 | 6/25/2005 | Shuffled garage to get wing kit to fit. | 0 | ||
| Started working on the main spars. | 4.5 | 6/27/2005 | Countersunk more holes | 0.6 | ||
| Finished preparing holes for plate nuts and started riveting them into place. | 3.5 | 7/1/2005 | Riveted plate nuts. | 2.0 | ||
| 7/3/2005 | Worked on tie down bracket | 1.0 | 7/4/2005 | Worked on rear spar. | 2.0 | |
| 7/5/2005 | Finished prep'ing rear spar and primed. | 7.5 | 7/6/2005 | Riveted the rear spar and started preparing ribs | 7.0 | |
| 7/7/2005 - 7/11/2005 | Rib preparation | 5.0 | 7/12/2005 | Finished fluting ribs | 4.2 | |
| 7/13/2005 | Clecoed ribs to spars. Drilled holes. | 3.0 | 7/15/2005 | Drilled and unibit 3/4 holes in the ribs for conduit | 2.5 | |
| 7/17/2005 | Acid etched ribs | 1.3 | 7/19/2005 | Alodined and primed ribs. Clecoed everything back together. | 3.5 | |
| 7/20/2005 | Finished wing "jig" | 2.8 | 7/21/2005 | Riveted the spar/ribs skeleton together. | 3.1 | |
| 7/22/2005 | Cut and match drilled holes in doubler under inside-top skin. | 2.0 | 7/24/2005 | Finished cleco'ing and drilled most of the holes in the top skins. | 2.5 | |
| 7/30/2005 | Clecoed and drilled bottom skins | 3.5 | 7/31/2005 | Built leading edge cradle. Cleoed right leading edge together and cleoed the assembly to the wing. | 5.1 | |
| 8/1/2005 | Match drilled leading edge skin to ribs. Attached and drilled fuel tank joint plate. | 2.5 | 8/27/2005 | Deburred and dimpled leading edge skin and ribs. Lightning hit house. | 5.5 | |
| 8/30/2005 | Treated and primed leading edge skin and ribs. | 1.0 | 8/31/2005 | Countersunk holes in spar. Put plate nuts on leading edge to tank joining strap | 2.0 | |
| 9/2/2005 | Riveted leading edge ribs to skin. Cut out landing light hole. | 4.0 | 9/3/2005 | Assembled landing light | 5.0 | |
| 9/4/2005 | Dimpled and countersunk main and rear spars and ribs.. Installed conduit. Wired landing light. | 4.5 | 9/5/2005 | Christine and I set about 1 1/2 ribs worth of rib to spar rivets. | 1.5 | |
| 9/6/2005 | Don and I set the rest of the rib to spar rivets. I riveted the skin to the spar. | 3.5 | 9/9/2005 | Prepared holes for upper skins. | 2.5 | |
| 9/10/2005 | Installed upper inside skin | 5.0 | 9/11/2005 | Installed upper outside skin. Removed wing from stand. | 2.5 | |
| 9/13/2005 | Built wing stand. Added lighting to garage. | 1.5 | 9/14/2005 | Finished wing stand. Drilled and deburred rear spar attachments. | 2.0 | |
| 9/19/2005 | Etched and primed rear spar parts. | 1.0 | 10/09/2005 | Cut push rods and assembled hinges. | 0.5 | |
| 10/13/2005 | Started assembling pushrods. | 0.7 | 10/15/2005 | Finished drilling and riveting pushrods | 2.0 | |
| 10/16/2005 | Primed pushrods. Misc. tasks | 3.5 | 10/18/2005 | Attached flap. Set aileron. | 4.5 | |
| 10/19/2005 | Deburred and dimpled inside bottom skin. | 1.5 | 10/20/2005 | Deburred and dimpled outside bottom skin. | 2.0 | |
| 10/21/2005 | Riveted 2/3 of inside bottom, skin. | 4.5 | 10/22/2005 | Finished bottom skins. Right wing done! | 7.0 | |
|
|
|
email: Luis Luciani