5/2/2007 First engine start   5/5/2007 Calibrated fuel tanks. Idle speed.  
5/6/2007 Fixed fuel leak. Taxi tests.   5/17/2007 Airworthiness inspection.  
5/20/2007 First Flight   10/10/2007 Repairman Certificate  
10/24/2007 Taxi tests (again)   10/29/2007 Second first flight  
11/1/2007 Away from the airport. Engine break-in.   11/3/2007 Trip to Brenham. Engine break-in.  
11/12/2007 Update on testing   11/28/2007 More testing  
12/7/2007 Aileron roll! Decent landings - finally.   12/14/2007 Whining about the weather. Taxi tests in the dark. Re-weighing.  
1/16/2008 Update Trip to Georgetown.   2/9/2008 Update.  
2/18/2008 End of Phase 1.        